The Great Flood of 2008 - Clean-up . 1-Sealed off slides/1-Sealed off.html Mon, 17 Nov 2008 09:46:52 -0500 Jalbum 8.0 The computer lab, mainroom, mailroom, back office and bullpen areas of the building were becoming toxic no-man's lands and needed to be sealed off from the rest of the building. The cafeteria was just inside the "safe zone". MC The computer lab, mainroom, mailroom, back office and bullpen areas of the building were becoming toxic no-man's lands and needed to be sealed off from the rest of the building. The cafeteria was just inside the "safe zone". MC slides/1-Sealed off.JPG 2-Sealed off slides/2-Sealed off.html Mon, 17 Nov 2008 09:46:52 -0500 Jalbum 8.0 The Fletcher Family Art Gallery...now located just this side of a toxic waste site... MC The Fletcher Family Art Gallery...now located just this side of a toxic waste site... MC slides/2-Sealed off.JPG 3-Petra's & Millie's office slides/3-Petra's & Millie's office.html Mon, 17 Nov 2008 09:46:52 -0500 Jalbum 8.0 To begin the cleaning, things needed to be relocated. Millie and Petra graciously, and unknowingly, offered up their office as a temporary storage area. MC To begin the cleaning, things needed to be relocated. Millie and Petra graciously, and unknowingly, offered up their office as a temporary storage area. MC slides/3-Petra's & Millie's office.JPG 4-Waiting to be cleaned slides/4-Waiting to be cleaned.html Mon, 17 Nov 2008 09:46:52 -0500 Jalbum 8.0 Even chairs that weren't in the water still needed to be cleaned as the humidity was so high throughout the building that anything that could soak up water, did, including chair fabric. MC Even chairs that weren't in the water still needed to be cleaned as the humidity was so high throughout the building that anything that could soak up water, did, including chair fabric. MC slides/4-Waiting to be cleaned.JPG 5-Clean Warehouse slides/5-Clean Warehouse.html Mon, 17 Nov 2008 09:46:52 -0500 Jalbum 8.0 By this time, quite a bit of progress had been done in cleaning and fumigating the warehouse area, which was 3 feet under water less than a week before. MC By this time, quite a bit of progress had been done in cleaning and fumigating the warehouse area, which was 3 feet under water less than a week before. MC slides/5-Clean Warehouse.JPG 6-Clean Warehouse slides/6-Clean Warehouse.html Mon, 17 Nov 2008 09:46:52 -0500 Jalbum 8.0 The great desert expanse known as the McKercher warehouse. MC The great desert expanse known as the McKercher warehouse. MC slides/6-Clean Warehouse.JPG 7-Clean Warehouse slides/7-Clean Warehouse.html Mon, 17 Nov 2008 09:46:52 -0500 Jalbum 8.0 Tables were being cleaned and getting ready for the return of our troops. MC Tables were being cleaned and getting ready for the return of our troops. MC slides/7-Clean Warehouse.JPG 8-Mailroom slides/8-Mailroom.html Mon, 17 Nov 2008 09:46:52 -0500 Jalbum 8.0 Every cleaning journey begins with a single pile. TSC Every cleaning journey begins with a single pile. TSC slides/8-Mailroom.jpg 9-Mailroom slides/9-Mailroom.html Mon, 17 Nov 2008 09:46:52 -0500 Jalbum 8.0 This is either another shot of the mailroom or a teenager's bedroom... TSC This is either another shot of the mailroom or a teenager's bedroom... TSC slides/9-Mailroom.jpg 10-Mainroom slides/10-Mainroom .html Mon, 17 Nov 2008 09:46:52 -0500 Jalbum 8.0 Resettling the floor - one buckle at a time. TSC Resettling the floor - one buckle at a time. TSC slides/10-Mainroom .jpg